Villa design visualisation Photo: a meeting room with a grey marble feature wall, a dark timber table and a glass-walled room beyond, overlooking the city Villa design visualisation Office design visualisation: an executive office with a book-matched marble wall, bronze shelving and a lounge set Photo: a white two-storey villa with black-framed glazing, behind a pool and a stone terrace Office design visualisation: boardroom with a walnut-panelled screen wall and a skyline view
Villas & workplaces / Dubai

Designed
from the
inside out.Interior design company in Dubai, for villas and offices.

Villa interior design, villa renovation and office design and fitout in Dubai, under one contract.
Design, approvals and construction coordinated from the start, to reduce avoidable rework, delays and surprises.

2011Established in Dubai
VillasRenovation & remodelling
OfficesDesign & fitout
One sequenceDecisions in the right order
One teamDesign through handover
50+ projectsDelivered since 2011
The Fajr film · 1:05

From first light to handover.

A minute inside our studio and on our sites: the plans we draw, the surveys we run, the crews who build it and the villas and offices we hand over.

Watch the filmSound on · 1:05
The Fajr film
Proof, not promises

See the work.
Then see how it happened.

The finished space is only part of the story. Understand the design decisions, site coordination and client experience behind it.

IMI office at One Za’abeel: curved glass meeting room beside the main corridorProject photo
Project preview · IMI, One Za’abeel

The finished space.

Explore the IMI office and the decisions behind its design.

Film
One project. The decisions, the work and the result.Explore project stories

Photographs and films from Fajr projects and our studio.

Two kinds of space. One way of working.

Live better.
Work better.

A better home. A workplace that works. We bring the brief, design, technical coordination, approvals and construction into one sequence, so the next decision is made at the right time.

Done in the right order

The Fajr Sequence
Eight decisions. One controlled build.

Eight decision checkpoints, from your first brief to handover. Some activities overlap; dependent work moves forward only when the information and permissions it needs are ready.

01 / 08
Fajr process: Brief
01 / 08BriefDefine the outcome before anyone starts drawing.
01 / 08

Brief

Define what the project has to achieve before anyone starts drawing.

Why it matters

Agree the priorities before time is spent designing the wrong solution.

01Scope

Define what's possible.

02Design

Bring it to life.

03Authority

Get it approved.

04Construction

Build from agreed information.

Read all eight stages
Client and Fajr designers reviewing fabric samples at the studio table

01 / Brief

Define what the project has to achieve before anyone starts drawing.

Why it matters: Agree the priorities before time is spent designing the wrong solution.

Laser scanner set up to survey an existing villa

02 / Survey

Measure the existing condition and expose constraints before design assumptions become expensive.

Why it matters: Find constraints before assumptions become changes on site.

Designers reviewing a printed space plan, option 1

03 / Plan

Resolve how the space works before materials and styling make changes expensive.

Why it matters: Resolve how the space works before committing to finishes and fabrication.

Material board: veneer, leather, stone and fabric samples

04 / Concept

Turn the approved plan into one coherent spatial, material and lighting direction.

Why it matters: Agree a coherent direction before making individual material purchases.

Technical drawings checked on screen in the Fajr studio

05 / Technical

Coordinate the information that site teams, suppliers and authorities actually need.

Why it matters: Resolve service and joinery interfaces before fabrication or installation.

Client signing off documents on site

06 / Approvals

Resolve external reviews and required permissions before they become delays on a mobilised site.

Why it matters: Identify the required permissions before committing to work that depends on them.

Villa renovation on site: the crew pouring the driveway slab

07 / Build

Construct from the coordinated set, with procurement, quality and programme controlled together.

Why it matters: Track procurement, workmanship and inspections against the agreed information.

Handover at a finished office reception

08 / Handover

Close the project with snagging, testing and documentation — not just a finished photograph.

Why it matters: Check the finished work, test systems and hand over the information needed to use the space.

Process images are illustrations, not project records.

Project stories

See the space. Understand the decisions.

Explore the brief, the constraints and the approach. The value of a project story is understanding how the result came together. Villa 47, Dubai Hills villa · Opus by Omniyat office · All projects

The Opus reception, renderRender
Workplace · Business Bay

The Opus

An executive workplace where technical coordination, custom fabrication, lighting and premium finishes had to land inside one tower programme.

Explore project preview
IMI office at One Za’abeel, glass meeting room and corridorProject photo
Workplace · One Za’abeel

IMI

An executive workplace with acoustics and MEP coordination at the heart of the brief.

Explore project preview
Villa 47 Fairways, Dubai Hills: the living room by the pool window, from the client filmFrom the client film
Residence · Dubai Hills

Villa 47

Full interior, design to furnishing — built around how the family actually lives.

Explore project preview

The Opus image is a render; the Opus is in fitout now. IMI and Villa 47 are finished projects.

Client proof

Hear it from the client.

A good result matters. So does how you get there: clear communication, considered decisions and a handover you understand.

Wyll, owner of Villa 47 Fairways, Dubai Hills, at home in the finished villaClient film
Villa · Villa 47 Fairways, Dubai Hills

The renovation experience.

Wyll, the owner, at home in the finished villa.

Fabian Munz, Managing Director of IMI Middle East, in the IMI office at One Za’abeelClient film
Office · IMI, One Za’abeel

From brief to move-in.

Fabian Munz, Managing Director of IMI Middle East, on moving into the finished office.

Useful before you call us

Questions you should ask before you hire anyone.

Cost, programme, approvals, design responsibility, quotation gaps and what should be fixed before construction starts. Fajr Interiors L.L.C has designed and built in Dubai since 2011.

Office lobby by Fajr Interiors
Fajr Insights

Know what you are deciding before you spend.

What does a full villa renovation actually include?

It can include strip-out, layout changes, MEP replacement, ceilings, flooring, kitchens, bathrooms, joinery, lighting, finishes, furnishing, exterior work and the approvals triggered by the scope. The first job is defining that boundary clearly.

What is Cat A vs Cat B in an office?

Cat A generally describes a base fitout; Cat B describes the tenant-specific workplace, including its layout, rooms, finishes, furniture and systems. The exact handover specification varies, so confirm what your landlord provides before comparing fitout scope.

When does the project cost become reliable?

A survey and a clear brief support an initial budget. Pricing becomes more reliable when drawings, specifications, measured quantities, exclusions and allowances are coordinated. Any later change should be identified and agreed before dependent work proceeds.

Who handles approvals?

Fajr prepares and coordinates the submission packages. Villa routes start with the developer or community NOC, then go to DDA, or to Trakhees on Palm Jumeirah and Jumeirah Islands. Office routes begin with landlord/building management and the relevant authority and life-safety route.

Can an office stay operational during renovation?

It depends on the works, access, safety and the services that need to be interrupted. Assess whether the project can be phased and agree the arrangements with the relevant parties before assuming the office can remain operational.

How long does a full villa renovation take?

It depends on scope, approvals, long-lead items and how early the design decisions are closed. A proper programme includes design, submission, procurement and construction — not only the months when trades are visible on site.

Does every stage happen one after another?

Not necessarily. Design, submissions and procurement planning can overlap. The key is that work dependent on a decision or permission does not proceed before that decision or permission is ready.

Instagram

Follow the work as it happens.

Site progress, joinery details, finished rooms and the sequence behind them, posted as projects move.

@fajrinteriors on Instagram
Photograph: living room at Villa 47 Fairways, Dubai Hills: a long sofa, timber media wall and garden glazing

Home or workplace

Start with
the whole picture.

Tell us what you are planning. We’ll frame the scope, sequence and cost logic before you commit to the expensive part. The first meeting is free, at our studio or by video.